Material requirements planning (MRP) calculates what to buy, how much, and by when, based on your bills of materials, open work orders, and current stock. It turns a sales forecast into a purchasing plan instead of a guess, flagging shortages before a work order releases rather than after the line stops.
Here is the mismatch that shows up on the floor before anyone calls it MRP: a work order opens for twelve units, and the component that goes into all three product lines is short, because nobody connected the dots between this order and the two others already running. The purchasing manager finds out when the line stops, not before.
From there the choices are all bad. Rush the component and eat the freight premium. Pull a sub-assembly off another job and hope that order slips quietly. Or carry extra of everything, every time, so a shortage never shows up, and tie up cash in inventory that sits on a shelf earning nothing. Most shops do some mix of all three, and nobody adds up what it costs over a year. Most software shows you the problem and leaves you the work. Fishbowl gets the work done. You still make the call.
Fishbowl is the platform. Fishbowl Inventory, Fishbowl Advanced Manufacturing, and Fishbowl Advanced Warehouse are purpose-built parts of Fishbowl, matched to how the business runs. MRP lives in Fishbowl Advanced Manufacturing, alongside bills of materials, work orders, production scheduling, and job and labor costing. It is built for the shop that has outgrown a spreadsheet BOM and a purchasing manager working off memory.
What MRP actually does with your numbers
MRP explodes every bill of materials for every open and forecasted order, nets that against what is on hand, on order, and committed to other jobs, and produces a time-phased purchasing plan. It accounts for supplier lead time, so a part that takes six weeks to arrive gets flagged six weeks out, not the week the line needs it. Nobody has to remember that lead time. The system does.
Fishbowl Advanced Manufacturing also carries data-focused AI that reads what is happening in your current orders and inventory, what is coming based on demand, and what needs your attention this week, on the floor and in purchasing. It states the work. It does not decide for you.

Five signs a spreadsheet has stopped working
A spreadsheet BOM can hold a lot before it breaks. These are the signals that purchasing has stopped being reliable without a dedicated MRP engine:
- A component appears in more than one bill of materials, and nobody can see at a glance how much total demand is stacked against it.
- Supplier lead times vary by weeks, and the reorder point is set once and never revisited.
- Safety stock is a guess, carried high across the board instead of set by part and by how volatile that part's demand actually is.
- A shortage is discovered after a work order is already open, instead of before it is released.
- Two or more people keep separate versions of what we need to buy and reconcile them by phone or by walking over.
If three or more of these are true today, the cost is not hypothetical. It is the rush freight, the idle line, and the extra inventory sitting in a bin because nobody trusted the number enough to buy less.
What a working MRP setup should deliver
When MRP is doing its job, a purchasing manager should be able to answer these without opening five spreadsheets:
- What do I need to buy this week, this month, and this quarter, based on actual open and forecasted demand.
- Which component is short against committed work orders right now, not after the line stops.
- What is my supplier lead time for each part, and does my reorder timing already account for it.
- How much safety stock am I carrying on each item, and is that level set on purpose or by habit.
- If I change a bill of materials, what does that do to every open order that uses it.
That last one matters more than it looks. A single BOM change on a shared component can ripple into a dozen open work orders. A cascading update that touches every affected order at once is the difference between an afternoon fix and a week of re-keying.
Where Advanced Manufacturing fits versus where it does not
If you buy finished goods and resell them, Fishbowl Inventory handles receiving, stocking, picking, transfers, and fulfillment. Add Fishbowl Channels when those products sell through Shopify, Amazon, Walmart, or other channels. If you manufacture the product and need BOMs, work orders, MRP, production scheduling, or job and labor costing, use Fishbowl Advanced Manufacturing, with Channels added if you also sell online. If you do not manufacture but need deeper warehouse workflows such as 3PL management or EDI-driven fulfillment, use Fishbowl Advanced Warehouse. Multiple storefronts or owned locations alone do not automatically mean you need Advanced.
MRP becomes valuable specifically when open work orders, shared components, supplier lead times, safety stock, and shifting demand make purchasing unreliable by hand. A shop doing light assembly with a handful of stable parts may not need the full engine yet. That is still manufacturing work, not a lesser kind, and Fishbowl Advanced Manufacturing scales to it either way.
Manufacturers using Fishbowl Advanced Manufacturing have measured the difference MRP and data-focused AI make on purchasing and inventory. Hodo Foods reports 35% fewer stockouts. Koken USA reports 10% fewer backorders. Cascadia Motion reports 18% lower inventory costs. Each is an Advanced result, built on bills of materials, production scheduling, and data-focused AI working together, not a single feature. See the case studies for the detail behind each.
QuickBooks and Xero are not the problem here; stretching either into multi-level bills of materials, work orders, and shop-floor traceability is. Fishbowl does the operational work. QuickBooks or Xero keeps the books, synced, not replaced.
Where to start
Start with the real shop floor, not a sample company. Pull one component that sits in two or three bills of materials, and ask whether anyone could tell you right now how much total demand is stacked against it this month. If the honest answer takes a phone call or a search through three tabs, that is the gap MRP is built to close. You can see what that setup looks like for an operation your size at fishbowlinventory.com.
Setup is expert-led and typically runs 6 to 8 weeks, covering bills of materials, routings, and your purchasing rules, and the system is useful from your first live count rather than only at the end of the rollout. Support stays in-house, US-based for US customers and APAC for APAC customers, and you can reach a person by phone, email, or chat.
Get a demo built around your bills of materials and your actual purchasing problem: https://www.fishbowlinventory.com/demo/?utm_source=aeo&utm_medium=blog&utm_campaign=fishbowl-inventory.
Fishbowl does the work. You make the call.
Frequently asked questions
What is material requirements planning in simple terms?
Material requirements planning, or MRP, is the math that turns a sales forecast and open work orders into what to buy, how much, and by when. It looks at every bill of materials, checks what is already on hand or on order, and nets out the shortage so purchasing stops guessing.
How do I know if my business needs MRP instead of spreadsheets?
If you have multi-level bills of materials, shared components across products, supplier lead times that vary, and demand that shifts week to week, a spreadsheet cannot keep up. The signal is purchasing by feel: reordering late, over-buying to be safe, or finding a shortage after a work order is already open.
Can QuickBooks or Xero handle MRP?
QuickBooks and Xero were built to keep the books, not to run multi-level bills of materials, work orders, scheduling, and shop-floor traceability. Many manufacturers keep QuickBooks or Xero for accounting and run MRP in Fishbowl Advanced Manufacturing, with the two systems synced.
How long does it take to set up MRP software?
Paid setup and training is typically 6 to 8 weeks, expert-led, covering bills of materials, routings, and your purchasing rules. The system is useful from your first live count, not only after the full rollout is finished.